
017. Condoblin to Euabalong
Posted by
SHARE URL:
Latest water level:
1.64 m
Level update time:
01-May-2025 20:05
WATERWAY:
Lachlan River
ENTRY POINT:
EXIT POINT:
AVERAGE GRADE:
Grade I
HIGHEST GRADE:
Grade I
TRIP DURATION:
4 days
TRIP LENGTH:
100 km
Gradient:
Hot Tip:
Be prepared and equipped for long hot paddle
Maps:
Shuttle Length:
Portage?:
Yes
Description:
Condobolin is the start of the section to Euabolong. The river gauge is above the Condo weir. Ensure adaquate flow has had time to reach your destination. This section has weirs , Micabil, Booberoi,Kiacatoo which will require portage around. This section ends at the Euabolong bridge.
Check water levels . number of weirs in this section. Run can be broken to shorter sections from reserve to weir or reserve.