018. Euabalong to Hillston
Posted by
SHARE URL:
Latest water level:
0.46 m
Level update time:
02-May-2025 12:05
WATERWAY:
Lachlan River
ENTRY POINT:
EXIT POINT:
AVERAGE GRADE:
Grade I
HIGHEST GRADE:
Grade I
TRIP DURATION:
6 days
TRIP LENGTH:
182 km
Gradient:
Hot Tip:
Be prepared and equipped for long paddle
Maps:
Shuttle Length:
Portage?:
Yes
Description:
No data